GENERAL INFORMATION
HERON will assist you through the process for a new natural gas connection. Read below to see the steps in the entire process.
STEP 1
Fill out your details in the Form of Interest for a new HERON natural gas supply connection, or call 18228 to find out whether the natural gas network is already active in your street address.
STEP 2
HERON, through its authorised representatives, will submit your application for a new natural gas supply connection (following the client’s authorisation to do so) to the gas distribution company (GDC), saving you from time-consuming and complicated procedures. The application / agreement for connection, along with the application / agreement for supply, will be signed afterwards by the end client.
STEP 3
The gas distribution company is responsible for constructing the exterior installation (inspection of the site of meter installation) and for installing the natural gas meter in your premises.
STEP 4
Once the exterior installation is complete, HERON’s representative installer will submit the interior installation design for approval by the gas distribution company. Once the design is approved, the representative will immediately complete the interior installation.
STEP 5
Once the interior installation is complete, the gas distribution company will perform a final inspection of the installation. Simultaneously with the final inspection, HERON will send your request for activation of your supply connection to the gas distribution company. The activation process will be done immediately, allowing you to enjoy the benefits of HERON’s competitive programmes.